Cookies and ads

We use cookies to make the site work and — with your consent — for Google ads and visit statistics. You can accept all, decline the optional ones, or choose in detail.

LocalTrader
Log in
Back to blog
How much does it cost to build a house: shell vs developer vs turnkey
Published 12/10/2026 1 min readInvestment costs

How much does it cost to build a house: shell vs developer vs turnkey

How much does it cost to build a house in 2026? A comparison of costs per m² for closed shell, developer, and turnkey stages, with price ranges for a 120–150 m² house.

Building a house is a long-term investment, and the question everyone asks is: how much does it cost? The answer depends on which stage you are referring to. ## Costs for a 120–150 m² house in 2026 - Closed shell stage (no installations): £400–£560/m² → £48,000–£84,000 - Developer stage (installations, windows, plaster): £700–£1,000/m² → £84,000–£150,000 - Turnkey (finishing + kitchen, bathrooms): £1,100–£1,600/m² → £132,000–£240,000 ## What impacts the budget most - House shape — every corner and bay window adds 5–10% to the costs. - Roof — a multi-pitched roof can be 30–50% more expensive than a gable roof. - Technology — block vs modular vs masonry: differences of ±15%. - Connections — electricity, water, gas: £2,000–£10,000, often overlooked in plans. - Region — labor rates in the east and in smaller towns can be 20–30% lower. ## Good practice Always add a 10–15% buffer to every estimate — on a construction site, there is always something that wasn't in the original design. Get several quotes for the same scope of work — the differences can be huge. Post your project on LocalTrader with your set budget and maximum price.

Looking for a reliable crew?

Publish your job for free and get offers from verified construction companies.

Publish a job

Related posts